Power Plant Pavana II
In May 1999 the construction of Pavana II was is concluded, which consists of an installed generation capacity of 82 MW.
Pavana II was installed to meet the ever rising energy appetite of Honduras, and Lufussa, offered the Honduran utility ENEE the lowest, most competitive, price for energy supply